·Totally 212 items |
Project type | Project title | Leader | Start | End |
National Natural Science Foundation project | The high-performance dam concrete highliting aggregate and temperature-humidity history | Cai Yuebo | 2006-01-01 | 2009-12-30 |
National Natural Science Foundation project | Quantitative evaluation method of the dam flood risk | Jiang Shuhai | 2006-01-01 | 2008-12-30 |
National Natural Science Foundation project | The mechanism of soil phosphorus-release in flood innudated region and the pollution risk | Liu Ling | 2006-01-01 | 2008-12-30 |
National Natural Science Foundation project | The impact of vertical stress changes on wave-current interaction speed profile | Zheng Jinhai | 2006-01-01 | 2008-12-30 |
National Natural Science Foundation project | The mechanism and control of big concrete fissure in modern hydraulic structure | Gu Chongshi | 2006-01-01 | 2009-12-30 |
National Supporting programme | Assessment of earthquake-damaged dams safety and the emergency treatment technology | Sheng Jinbao | 2010-3-1 | 2010-12-1 |
National Supporting programme | Intellectualization micro-irrigation in the arid area and its demonstration | Jiao Xiyun | 2007-12-01 | 2010-12-30 |
National Supporting programme | Ecology control mechanism and techniques for drinking water source area in rural regions | Zhou Ying | 2007-09-01 | 2010-01-30 |
National Supporting programme | Techniques of insuring dam safety | Zhang Jianyun | 2007-06-01 | 2009-12-30 |
National Supporting programme | Key techniques of risk management for the South-to-North river diversion operation | Liu Heng | 2007-05-01 | 2009-12-30 |
National Supporting programme | The impacts of the use of the three gorges dams on the flood defence of middle and lower Yangtze River | Shi Yong | 2007-05-01 | 2008-12-30 |
National Supporting programme | The techniques of rain and flood resources utilization and its application | Wang Yintang | 2007-05-01 | 2009-12-30 |
National Supporting programme | Basin flood early warning forecast and risk management key technologies (topic two, topics three)
| Liu Jiufu | 2007-01-01 | 2009-12-30 |
National Supporting programme | Key supporting techniques of large agricultural irrigation improvement project | Peng Shizhang | 2006-10-01 | 2010-10-30 |
National Supporting programme | key techniques of catchment flood early warning, forecast and risk management (topic two and three) | Liu Jiufu,Bao Weiming,Wu Shiqiang | 2006-10-01 | 2009-12-30 |
Province/Ministry-level project | Comprehensive Planning of River Network in Suzhou Urban Planning Region | Zhang Xingnan | 2007-9-4 | 2007-3-5 |
Province/Ministry-level project | Analysis of Natural Water Consumption in the Lower Yellow River | Hao Zhenchun | 2007-9-4 | 2007-12-5 |
Province/Ministry-level project | Development of Flood forecasting System for the Baipenzhu Reservior | Bao Weimin | 2007-9-3 | 2007-12-4 |
Province/Ministry-level project | Flood defence Operation and Flood Forecasting Sub-system of the Flood Control System in Guangdong Province - Phase I Project | Zhang Xingnan | 2007-8-4 | 2007-12-6 |
Province/Ministry-level project | Development of Water Resources allocation model for Hebei Province along the Middle Route of South-to-North Water Diversion Project | Dong Zengchuan | 2007-7-5 | 2007-12-6 |
Province/Ministry-level project | Analysis of the Possibility and Potential of Water Supply to Yellow River from SNWDP Eastern Route of the South-to-North Water Diversion Project | Li Zhijia | 2007-7-4 | 2007-12-4 |
Province/Ministry-level project | Analysis and Query System for Storm-flood events in Songhuajiang Basin | Dong Zengchuan | 2007-7-3 | 2007-12-4 |
Province/Ministry-level project | Groundwater Resources Evaluation in Water Source Area for Dixian 15-ton Paper Making Project | Shu Longcang | 2007-5-4 | 2007-12-4 |
Province/Ministry-level project | Development of flood management system of the Yuanyangchi Reservoir | Bao Weimin | 2007-5-4 | 2007-12-5 |
Province/Ministry-level project | Information Support System of Siminghu Reservoir Flood Forecasting and Regulation | Zhong Pingan | 2007-5-4 | 2007-12-6 |
Province/Ministry-level project | Design Flood Re-check and the Assessment of the capacity of Urban Flood Control in the Yongjian River Basin | Fang Guohua | 2007-5-4 | 2007-12-4 |
Province/Ministry-level project | Monitoring and Management System for the Jiangsu Reach of Yangtze River | Ding Xianrong | 2007-4-5 | 2007-6-6 |
Province/Ministry-level project | Storm Flood Forecasting and Early-earning System fro the area between Xiaolangdi and Huayunkou of the Yellow River | Dong Zengchuan | 2007-4-4 | 2007-7-6 |
Province/Ministry-level project | Real-time Information Management System for Shanghai Sea Embankment Monitoring | Zhang Xingnan | 2007-4-4 | 2007-2-5 |
Province/Ministry-level project | Study on the required flow for Ecological Environment in Jiangsu Province | Dong Zengchuan | 2007-3-3 | 2007-12-6 |
|